Detail Engineering:
SMB would provide Detailed Engineering Services as under:
A) Process Engineering: -
B) Utilities:
- Prepare Specification for Process Equipment’s like LAF, Pass boxes, Revers laminar airflow, air shower… detail specification with qty and sizes.
- Production machine with capacity and User Requirement Specification of each section as per mutual understanding.
- laboratory furniture detail as per room requirement or discussed at layout finalisation detail of Bill of Quantities and drawing for Laboratory furniture procurement
- Laboratory equipment list as per client suggested or standard requirement.
- Finalization of capacities of various equipment’s.
- 1) Utility Equipment & Mechanical / Piping Design:
- Prepare P&I Diagram of engineering utilities.
- Prepare utilities consumption chart based on room list and check with Existing Equipment capacities as per vendor specified.
- Preparation of specification for equipment based on consumption list.
- Prepare pipe routing drawings, pipe connection drawings.
- Prepare Item Specifications for various pipes system.
- Prepare Insulation specifications and Bill of quantity.
- Prepare tender specification for Mechanical erection work
- 2) Water Generation, Distribution & Plumbing :
- Preparation of Pharmaceutical Clean water generation and Distribution system design and detail bill of Quantity as per Plant requirement
- Preparation of the plumbing layout for the entire project based on the functional and clients requirements.
- Preparation of the chart for the water supply and sewage/effluent flow lines.
- Design parameters for distribution of various types of water.
- Designing details for the water distribution system of the project such as gravitational flow or hydro pneumatic flow system.
- Working out the invert levels of the waste water lines and inspection chambers for flow of waste water to the treatment facility.
- Designing of the Rain Water Harvesting system for the entire project based on the statutory authority requirements as per Suggest by Client.
- Designing and preparation of detail drawings for waste water/effluent treatment facilities such as Sewage Treatment / Effluent treatment plant.
- Working out bill of quantities, for enquiries.
- 3) Clean Room Modular Partition :
- Preparation of specification with type of panel, thickness of sheet, infill material used density of infill material.
- Based on Reflected ceiling plan Vendor with prepare detailed shop drawing with their ceiling / wall grid design.
- Vendor will prepare final coordination drawing with cutout required for HEPA/ light / pendent/ socket / view panel/ pass box etc.
- Prepare Detail bill of Quantity of Door, Partition panel, view panel, riser, coving, and door associates….etc.
- 4) Fire, Safety and Security System :
- Prepare Fire Escape Route with Assembly location plan.
- Designing the fire protection system based on Smoke, Heat…sensor based
- Designing of fire hydrant system, capacity of fire hydrant pumps, sprinkler system, fire alarm system, fire extinguisher system, CCTV system, etc. (with the support of local fire consultants).
- Preparation of drawings for all the above systems.
- Prepare BOQ for Floating inquiries.
- Prepare Single Line diagram with transformer / DG capacity.
- Prepare the total Electrical load consumption list.
- Prepare the power feeder and cable schedule list.
- Prepare Electrical contract work Specifications.
- Prepare the single line Diagrams as per load distribution.
- Prepare Light / Power layout and it’s circuiting.
- Prepare Cleanroom & other light Fixture specification and detail drawing Prepare Cable Tray Layout.
- Prepare All Electrical Item Specifications.
- Prepare AHU Grouping layout.
- Prepare Pressure Gradient, Area Classification layout and obtain approval.
- Prepare Design Basis.
- Work out Heat Load Calculations
- Prepare Chilled water & Heating System.
- Prepare schematic sketches of typical HEPA filter boxes and Risers details.
- Prepare tentative AHU layout with assumed Dimension based on Heat Load calculation
- Prepare Reflected false ceiling layout for HVAC Requirements
- Review Duct layout, AHU GA Diagrams submitted by Contractor.
- Review Shop Drawings of following HVAC Contractor Items:
- Hepa filter box.
- Return air Riser.
- Magnehelic gauge boxes.
- Review and approve Air flow diagram layout prepared by and submitted by Contractor AHU wise.
- Prepare Tender specification for complete HVAC system.
- Prepare Bill of Quantity for Complete HVAC system.
- HVAC – EMS:
- Develop design philosophy and system architecture.
- Control wiring.
- Prepare list of EMS Bill of Quantity